House Vélez-Málaga € 1.750.000,-
Ref.no: RSOR5233291
Price: € 1.750.000,-
House Vélez-Málaga € 1.750.000,-
| Bedrooms | 4 |
| Bathrooms | 5 |
| Lot size | 560m² |
| Living area | 564m² |
| Pool | yes |
| Garden | yes |
| Parking | yes |
| Cooling | %lng_% |
| Storage | %lng_% |
| Elevator | yes |
| Built year | |
| Floor | |
| Close to golf | |
| Close to port | |
| Close to shops | |
| Close to sea | |
| Close to town | |
| South West | |
| Excellent | |
| New construction | |
| Private Pool | |
| Hot A/C | |
| Cold A/C | |
| Fireplace | |
| Garden View | |
| Pool View | |
| Lift | |
| Fitted wardrobes | |
| Near Transport | |
| Private terrace | |
| Gym | |
| Games room | |
| Storage Room | |
| Utility room | |
| Ensuite bathroom | |
| Bar | |
| Domotics | |
| Basement | |
| Kitchen-Lounge | |
| Private Garden | |
| Landscaped Garden | |
| Entry Phone | |
| More Than One Parking Space | |
| Private parking | |
| Luxury | |
| New Development |
Price: € 1.750.000,-
More information ›››
Discover this spectacular contemporary villa under construction in Vélez-Málaga, set on a corner plot in one of the region’s most exclusive residential areas. It combines modern architecture, refined finishes and open views over the golf course and the Bay of Torre del Mar.
With 564.76 m² built and 443.65 m² usable, the home offers generous, light-filled interiors designed for comfort and style. The main floor features an elegant living-dining area, a designer kitchen with pantry and laundry room, plus a guest toilet. A lift connects all floors for added convenience.
The villa includes four en-suite bedrooms, each with a private bathroom, dressing area and fitted wardrobes. The basement adds exceptional versatility with a wine cellar, gym, office and multi-purpose room.
Outside, landscaped gardens, a private terrace and an infinity pool create a peaceful setting to enjoy the Mediterranean climate. The property also benefits from smart home technology, air conditioning, security glazing and video surveillance, along with a southwest orientation and private parking.
Construction starts in 2026, with completion scheduled for 2027-12-01.
NL - Nederlands
EN - English
DE - Deutsch
FR - Français



